Fort St. John Results Based Pilot Project
Public
Advisory Group Meeting #11
January
7, 2002
6:00pm to
9:15pm
Fort St. John Cultural Center
APPROVED
MEETING SUMMARY NOTES
Attendance:
Name Interest Phone E-mail Participants: - Roger St. Jean 787-5645 John Dymond Slocan L.P OSB Corp 261-6464 Doug Russell Louisiana-Pacific Canada Ltd.
782-3302 Canfor 788-4355 PAG
Interest Representatives and Alternates: Mike Waberski
Oil and Gas 787-0300 Ron Wagner Labour 787-0172 Frank Schlichting Range, Agric. & Private Woodlots 787-5383 Orland Wilkerson Urban Communities 787-6243 Wayne Sawchuk Environment & Conservation 788-2685 Neil Meagher IWA 563-7771 Gary Rehmeier 787-5214 Karen Goodings Rural Communities 785-8084 Budd Phillips Non-commercial Recreation 785-1283 Facilitator: Gail Wallin 305-1003 Advisors: Paul Albu SBFEP 787-5600 Joelle Scheck 787-3283 Ron Rutledge Ministry of Sus. Res. Mgt., FSJ 787-5632 Paul Wooding Canfor 604-661-5423 Observers: None
1.
Welcome
·
This is
the eleventh meeting of the Public Advisory Group
·
The
purpose of this meeting is to continue developing Goals and Values of the
matrix, commencing with Element 5 and 6.
·
At the
subsequent meeting the participants will provide their response to the PAGs’
input to the Values and Goals.
·
A
request was made of the PAG for permission for photographs of the group to be
taken during this meeting, for the purpose of publication in the regional (North
and South Peace) Canfor newsletter. Permission for photographs was granted by
the PAG. The PAG was reminded that the newsletter is bound by the Terms of
Reference regarding any outgoing or external communication.
2.
Review of Meeting Agenda
·
The
draft Agenda was distributed and reviewed by the PAG for additions, deletions or
corrections
·
Draft
Agenda was changed to include the addition of a brief update regarding the
status of the Pilot Project Regulation.
3.
Review of Meeting Summary December 3 2001
·
Copies
of the Dec 3 2001 PAG meeting were distributed and time was given for review of
the text portion.
·
Correction to the spelling of names was requested to be
made for 2 PAG representatives.
·
PAG was
asked whether the Matrix attached to the Dec 3 2001 Meeting Summary accurately
captured their intended input.
·
Question was raised as to the meaning of the word
‘perjorative’ in Goal, (3), Element 1.1. This is an item that arises as a result
of wording established during the November 13 2001 meeting. As the meaning of
the word is obscure, it is recommended that an alternative wording be found.
(perjorative means detrimentally.)
·
ACTION: reword PAG consideration (3) under Goals, Element
1.1
·
Element
4.1 Carbon Uptake and Storage: The PAG recommends that the Goal wording be
replaced with ‘unclear what this goal should be: request further information”.
·
ACTION: change matrix wording.
4.
Presentation on Carbon Cycling
·
Ron
Rutledge of the Ministry of Sustainable and Renewable Resources provided an
overhead presentation and Q&A on carbon cycling. A handout was provided
entitled “British
Columbia forests, forestry practices, and carbon dioxide”, from the Ministry
of Forests research branch. Presentation was intended to provide background
information regarding the substance of Element 4.1 of the Matrix.
·
Information as to those things which might be considered as
‘indicators’ for carbon uptake and storage was also provided.
·
A
general group discussion ensued regarding climate change, carbon cycling, and
effects of human activities.
·
Further
discussion of Carbon Cycling was tabled.
·
ACTION: PAG requests that W.G. provide new proposal for
Goal for 4.1.
5.
Update on Pilot Project Regulation
·
Doug
Russell provided information that the proposed regulation passed legislature on
December 4, 2001, with an effective date of December 1, 2001.
·
A final
draft is available from the Ministry of Forests
·
The WG
is unaware of when the formal announcement of the new regulation will be
made.
·
ACTION: mail hardcopy of new regulation to Wayne Sawchuk
and Frank Schlichting, email copies of Regulation to all other PAG
members.
6.
Continue Input to CSA Matrix
·
PAG was
reminded that the CSA Element wording may not be changed. Also, the Values and
Goals (Criteria 5 and 6) in the updated Matrix supplied this evening is proposed
by the participants, for comment, review and input by the PAG.
·
Element
5.1:
·
PAG
suggested that 5.1 capture “non-timber benefits” not otherwise addressed in the
matrix.
·
PAG
raised a concern that the word “feasible” in the Element wording provides
‘wiggle-room’ for industry, and suggested that the word should be removed.
·
PAG
discussed that ‘feasible’ is balanced by ‘acceptable’ in the same statement in
the Element, thus providing a level of assurance that industry determined
feasibility is guided by the public’s determination of acceptable practice.
·
PAG was
reminded that Element wording is CSA determined and may not be changed by this
table. Paul Wooding provided an overview of the CSA revision process and
opportunity for public input into potential change to the CSA standards.
·
Value: need
to rephrase “non-timber values” to refer to social or multi-use benefits.
·
Goal: PAG
discussed the potential to define or describe desired conditions for a range of
individual activities or values (i.e. range, trapping, hunting, rec.
opportunities, visual quality, wilderness, back-country, etc.) for a series of
Goals.
·
A group
discussion ensued as to whether these individual activities or values may
instead be used as Indicators for this Element.
·
PAG
suggests the participants consider removing the word “feasible” in Goal 5.1, or
add ‘and ecologically acceptable’ to it.
·
Element
5.2:
·
PAG
conducted a protracted discussion of the relative importance of locally based
processing facilities versus the export of raw materials to other areas.
·
PAG
discussed appurtenancy, and asked what government direction would be on this
topic. This subject is not one which the Pilot Project may address.
·
Value: PAG
suggests that wording incorporate local economic viability, or wording that
captures the maintenance of an economically viable community.
·
Goal: PAG
suggests
1.
Maintain sustainable harvest at a stable rate over the long
term (ie cut level for perpetuity).
2.
Maintain local processing facilities. (specific) (Note that
the PAG was split in their opinion as to the relative benefits of the movement
of raw materials out of the local area versus maintaining local processing
facilities. No consensus was achieved on this issue).
3.
Provide
diverse opportunities for local economic viability for local communities
(general).
4.
Maintain local employment opportunities (specific).
·
Element
5.3:
·
Value:
fair distribution of benefits and costs. Question and discussion arose regarding
the meaning of “fair”. (i.e. if one is paying 50% of the cost, should one expect
50% of the benefit?)
·
Goal:
PAG suggests:
1.
the
goal should reflect ‘cost’ as well as ‘benefit’
2.
need to
allow a component of the timber supply to the private entrepreneur, outside of
the current Small Business Enterprise Programme.
3.
“maintain opportunities for the community to access
non-commercial benefits of the forest” (see if this is addressed in 5.1: review
5.1 to include ‘range of community interests may access commercial and
non-commercial benefits’)
·
No
consensus on 5.3 was reached by the PAG, as there were widely divergent points
of view held by PAG representatives on this element.
·
Element
6.1 to 6.4: Criterion 6 is
tabled until next meeting.
7.
Update on Scientific Advisory Committee
·
Tabled
until next meeting
8.
Other Business
·
None
discussed
9.
Next Meeting
·
Potential meeting dates were proposed. Agreed that the next
meetings would be
February 4, 2001
-
work on
PAG input to Criteria 6 Values/Goals
-
review
WG response to PAG input for Criteria ½ Values/Goals
-
review
of WG proposed Indicators/Obj. for Criteria 1/2
February 25, 2001
-
review
of WG response to PAG input for Criteria 2/3.
-
Review
of WG proposed indicators/objectives for Crit. 2/3
·
Subsequent meeting dates of March 11, April 9 and April 22
proposed for consideration (Please note that the Graham
River meeting will not interfere with Mar. 11 date, as it will the GR meeting is
during the day. Proposal of March 11 for a PAG meeting is now
confirmed).
·
There
may be need for another meeting before proposed May 9 meeting to wrap up all PAG
input to Criteria.
·
PAG
agreed that starting times for the next meetings will be at 5:30pm rather than
6:00pm, and ending time will be 9:30pm.
·
PAG was
asked to consider, for the next meeting, what further information is required in
order that PAG is able to move ahead with concluding meaningful Values and
Goals, and formulating indicators and objectives.
·
PAG
responded that they would like to know the number of range permits in the DFA,
and also the number of Animal Unit Months (AUM) that have been calculated as
available in the same area.
·
PAG was
informed that a different meeting venue may be sought for the next set of
meetings but will be advised of any change in advance of the Feb.4th meeting.
Meeting concluded at 2115hr.